Patio gravel calculator
Work out the compacted base and bedding layer a gravel or paver patio needs, as two separate materials.
Patio gravel calculator
Work out the compacted base and bedding layer a gravel or paver patio needs, as two separate materials.
Enter your dimensions to see how much gravel you need.
Order this much
What this result assumed
How this was calculated
Recent calculations
Saved in this browser only. Nothing is sent anywhere.
Results are estimates for planning. Bulk density varies by supplier, moisture and how much the material is compacted, so confirm quantities with your supplier before ordering.
Patio gravel calculator
Why a patio needs two layers, not one
A patio carries furniture, foot traffic, and sometimes a table and chairs concentrated on a few legs, which is enough load to need a genuine compacted base underneath, not just a levelling layer. The base does the load-bearing work; a thin bedding layer on top of it is what the pavers or the visible stone actually sit in, levelled and screeded flat. Treating the whole build as one material at one depth gets the base tonnage wrong, because the base is usually several times deeper than the bedding.
Sizing the base for a patio specifically
A patio generally needs less base than a driveway, since it never carries a vehicle, but more than a garden path, since furniture and foot traffic still load it. Four inches of compacted crusher run is a common starting point on firm ground, with more depth added for soft or poorly draining soil. This is a starting point, not a specification: what your patio actually needs depends on the ground it sits on.
Ordering base and bedding together
Both materials are usually available from the same yard and both are sold by the ton or the cubic yard. Because the base is deeper, it dominates the order by weight even though the bedding layer is what you actually see and feel underfoot. Calculate both here, add your allowance, and check the total against any supplier minimum before ordering, since a small patio's bedding sand alone can fall under a yard's minimum even when the base comfortably clears it.
Sequencing a two layer patio build
A patio is one of the clearer cases on this site for why the layers mode exists at all. A single area and depth figure cannot describe a patio properly, because a patio is not one material, it is a compacted structural base topped by a thinner bedding layer that the pavers or the finished gravel surface actually sit on. Treating the whole stack as one undifferentiated depth of gravel either wastes money by using expensive bedding stone where cheap crusher run would do the structural job just as well, or under-builds the base by borrowing depth from the layer that needs to stay thin and level for the finished surface to sit flat.
Working through the two layers separately also forces a useful planning order, and that order is worth following even if the calculator itself returns both numbers at once. The base goes down first, across the full excavated footprint, and gets compacted in lifts rather than all at once, since a deep layer of crusher run compacted in a single pass tends to compact unevenly, leaving soft spots that show up later as low spots in the finished surface once traffic and weather have had time to find them. Only once the base has been compacted and checked for level does the bedding layer go on top, screeded flat immediately before the pavers or decorative stone are laid into it. Running the base and bedding figures through this calculator together, rather than guessing a combined depth, keeps that sequence honest from the ordering stage onward, so you are not short on one material while sitting on a surplus of the other.
Patio sizing carries one planning detail that is easy to miss when you measure only the finished surface you can see: the base generally needs to extend slightly beyond the edge of the pavers themselves, not stop flush with them, because the edge of a patio is where compaction is weakest and where a base that ends exactly at the visible boundary tends to crumble or settle first as the unsupported edge loses material outward over time. If you are building the patio next to a larger excavated or paved area, it is worth checking the paver base calculator for how that margin is typically handled, since it runs the same extend-past-the-edge logic independently and can confirm the figure you are already planning to use.
Material choice follows the same two-layer logic, and substituting one material for the other rarely saves money once the whole job is accounted for. The base layer wants an angular material that locks together and resists shifting under weight, which is why crusher run is the standard choice there and not a rounded decorative stone that would simply roll under load. The bedding layer sits in a narrower band of acceptable materials too, since it has to screed to a flat, consistent surface that pavers can be set into without rocking or settling unevenly once weight is placed on them. If the patio you are planning connects to a driveway or a wider access path rather than standing alone, the gravel driveway calculator uses a related base and surface logic and is worth a look so the transition between the two areas uses a consistent base depth rather than two mismatched ones meeting at an awkward seam.
Cost estimates for a patio project usually undercount the base layer, because it disappears from view once the pavers go down and people tend to price only what they can see finished rather than what actually went into the ground. Running both layers through this calculator before ordering, then checking the combined total against the gravel cost calculator, gives a realistic budget figure rather than one based only on the visible surface material, and the how many pavers do I need guide is a useful companion once the base and bedding figures are settled and you are ready to work out the surface layer itself, along with any edging the finished patio will need to hold its line. Ordering the two layers from the same supplier in a single delivery, rather than two separate trips, is also worth asking about up front, since many yards will combine a load of crusher run and bedding stone onto one truck for a single delivery fee, which is a small saving but one that only works if both quantities are settled before the truck is booked rather than ordered piecemeal as the project proceeds.
Frequently asked questions
How much gravel do I need for a patio base?
For a 200 square foot patio with a 4 inch compacted base, the base layer alone is about 67 cubic feet, or 2.5 cubic yards, roughly 3.7 tons of a typical crusher run. A 1 inch bedding layer over the same area adds about 17 cubic feet, or 0.85 tons of bedding sand. Enter your own patio dimensions above for the exact figures.
What depth of gravel base does a patio need?
Commonly 4 inches of compacted base is a starting point for a patio on firm, well-drained ground, with more added on soft or clay soil. This is a common depth, not a requirement: the actual figure depends on what will sit on the patio and the ground underneath it, and for anything unusual a local contractor's judgement of the specific site beats any general guideline.
Can I put gravel directly on soil for a patio?
Gravel laid directly on soil will sink into the ground over time, especially on soft or wet soil. A compacted base underneath prevents this, which is why the calculator defaults to a crusher run base. On very firm, well-drained ground with light use, a simpler build may work, but for anything carrying furniture and regular foot traffic, a proper base is worth the extra material.
What is the best gravel for a patio surface?
Pea gravel and decorative stone are common for a patio surface because the rounded stones are comfortable underfoot and come in a range of colours. Angular crushed stone stays firmer but can be sharp under bare feet. The calculator works with any material you select, showing the tonnage and bag count for the bedding layer and the base separately.
How much does it cost to build a gravel patio?
The cost depends on the area, the base and bedding materials, and your local supplier's prices. For a 200 square foot patio with a 4 inch base and 1 inch bedding, you need roughly 3.7 tons of base stone and 0.85 tons of sand. Enter your own prices in the cost section of the calculator for the actual total.
Do I need edging for a gravel patio?
Yes, especially if the surface is pea gravel or any rounded stone. Without edging, gravel migrates into adjacent lawn or garden beds within a season. Steel, aluminum, plastic and stone edging all work, and the choice is largely aesthetic. The calculator focuses on gravel quantities, but budget for edging as part of the project.
How thick should gravel be for a patio?
For a loose gravel patio surface, 2 to 3 inches of decorative stone is common. Underneath that, a compacted base of 4 inches provides stability. The calculator treats the base and surface as separate layers with their own materials and tonnages, since they serve different purposes and use different products.
Is a gravel patio cheaper than a concrete patio?
A gravel patio is almost always cheaper in materials, though the comparison depends on the sizes and finishes involved. A basic gravel patio might cost 1 to 3 dollars per square foot in materials, while concrete runs 4 to 8 dollars. The calculator gives you the material quantities so you can price both options against local quotes.