Gravel Calculator

How much gravel do I need?

Enter the area and the depth. You get tons, cubic yards, bags and what to actually order.

How much gravel do I need?

Enter the area and the depth. You get tons, cubic yards, bags and what to actually order.

What do you want to calculate?

Changing the goal changes which fields you fill in.

Enter the area and the depth you want.

Typical starting values for this project. Adjust to match your site and your supplier.

Units
Shape of the area

Measure the full length of the gravel area.

Use the average width if the area tapers slightly.

The thickness of the gravel layer you intend to lay.

Depths shown are common starting points, not a specification. What a job needs depends on the soil, drainage, load and local practice.

Leave blank to use the typical figure for this material, or enter the density your supplier quotes.

Waste and compaction allowance

Extra material for spillage, uneven ground, cuts and the fact that loose gravel settles once it is compacted.

Bagged gravel
Cost

This is your own quote worked through, not a live local price. Delivery, fuel charges and minimums vary widely between yards.

Delivery

Capacities differ by vehicle and by what the axle weight limits allow locally. Use the figure your supplier gives you.

Supplier rules

Most yards will not sell an arbitrary quantity. Enter their minimum and increment and the order is rounded to match.

Enter your dimensions to see how much gravel you need.

Results are estimates for planning. Bulk density varies by supplier, moisture and how much the material is compacted, so confirm quantities with your supplier before ordering.

How much gravel do I need?

The short answer

Multiply the area by the depth to get a volume, then multiply that volume by the density of the material to get a weight. Those two steps are the whole thing. A 20 by 10 foot area at 4 inches deep is 200 square feet and 66.7 cubic feet, which is 2.47 cubic yards, and at 1.4 tons per cubic yard that is about 3.46 tons. Add ten percent for waste and settling and you are ordering 3.8 tons.

The step that trips people up

Depth is where the error lives, for two reasons. First, it multiplies straight through: two inches against three is a fifty percent difference in what you pay for the same area. Second, it is usually measured in inches while the area is measured in feet, so it has to be divided by twelve before the two can be multiplied, and forgetting that gives an answer twelve times too large. The calculator handles the conversion, but it is worth knowing why the number moves the way it does.

Why the answer is a range, not a number

Two suppliers ten miles apart will quote different tonnages for the same cubic yard, because bulk density genuinely varies with the parent rock, the grading, how wet the material is and how much it has been compacted. The densities on this site are typical planning values shown with the range they vary within. The most accurate calculation you can do is the one that uses the figure your own supplier gives you for the pile you are buying, and the density field is editable for exactly that reason.

From a number to an order

Add an allowance, then round to what the yard will sell. Ten percent covers spillage, uneven ground, cuts and the settling that happens when loose gravel is compacted. After that, check the supplier's minimum order and the increment they sell in, because those can move the final figure more than the allowance does. The result panel keeps all three separate: what the job needs, what the allowance adds, and what to put on the order.

Getting from a rough idea to an order

This page is built to be the starting point for someone who has a project in mind but has not yet settled on units, a specific material, or an exact depth, which is why its output includes tons, cubic yards and bags together rather than picking just one. If you already know you want the answer specifically in tons because that is how your supplier quotes, the gravel calculator for tons leads with that number directly, and the same goes for the gravel calculator for cubic yards if cubic yards is the unit you are thinking in. This page is the more general entry point before you have made those smaller decisions, useful precisely because it does not ask you to commit to a unit before you have even finished measuring the project.

Measuring the area accurately is usually the easier half of this calculation, since a tape measure gives a straightforward length and width for most footprints, even an irregular one broken into a few rectangles and added together, and most yards and gardens can be reduced to that kind of simple rectangle breakdown with a bit of patience. Depth is the number that causes more uncertainty, because it depends on what the gravel is for rather than on anything you can simply measure with a tape before the project starts. A decorative bed, a path, and a base layer under something heavier all call for different depths, and guessing low here is the more common mistake, since a too shallow layer settles and thins out faster than people expect, especially under regular foot traffic. When in doubt between two depths, leaning toward the deeper one costs a modest amount of extra material but a shallow layer that wears through within a season usually ends up costing more once you add a second order to top it back up.

Because the right depth depends on the specific use rather than being one fixed figure, this page's answer is best treated as a function of the depth you choose rather than a single universal number. If you are unsure what depth fits your specific project, whether that is a driveway, a drainage bed or a decorative path, the material specific calculators on this site, such as the pea gravel calculator or the gravel driveway calculator, build in guidance toward a typical depth for that exact use case, which is often a faster path to a sensible number than estimating depth from a general page alone. It is worth reading the relevant project specific page even if you already have a depth in mind, since it may surface a reason to adjust that depth you had not considered.

Once you have a volume or tonnage figure, converting it into an actual order means deciding between bulk delivery and bagged material, and possibly splitting a large order across more than one truckload. Small projects usually resolve this quickly through the gravel bag calculator, while anything approaching a full driveway or a sizable patio base benefits from a direct supplier quote run through the gravel cost calculator. The step by step guide to calculating gravel walks through this same sequence in more narrative form if you want the reasoning spelled out alongside worked examples, which is a useful cross check if the figure this page gives you still feels uncertain.

It is also worth treating the figure here as a starting point you may need to revisit once the base is actually dug and graded, rather than a number that is locked in before the project starts. An uneven subgrade, a slightly larger footprint once you account for edging, or a change in depth partway through a project are all common reasons the amount ordered ends up a bit different from the first estimate, and keeping that in mind when you decide how aggressively to round up avoids both a wasted surplus and an awkward mid project top up order. None of that means the number above is unreliable, only that it describes a plan rather than a guarantee, the same way a shopping list describes what you intend to buy before you actually walk the aisles and see what is in stock.

Frequently asked questions

How do I calculate gravel for an area in square feet?

Multiply the square footage by the depth in feet to get cubic feet, divide by 27 for cubic yards, then multiply by the tons per cubic yard for your material. For 500 square feet at 3 inches: 500 times 0.25 is 125 cubic feet, which is 4.63 cubic yards, or about 6.5 tons at a density of 1.4. Enter it above and the calculator shows every one of those steps.

Do I need to add extra for compaction?

For anything that will be compacted, yes. Loose gravel occupies more volume than the same material does once it has been rolled or plated, so a layer that has to finish at four inches compacted needs more than four inches of loose material to start with. How much more depends on the material and the equipment, which is why this site treats it as an adjustable allowance you can see rather than a hidden factor baked into the result.

What's the formula for calculating gravel?

Area multiplied by depth gives volume, and volume multiplied by the material's density gives weight. Those two multiplications are the entire formula for calculating gravel by hand; the calculator above does both steps and adds your allowance on top.

How much gravel do I need for a 20 by 20 foot area?

At 4 inches deep, a 20 by 20 foot area is 400 square feet, which works out to about 4.94 cubic yards or roughly 6.9 tons at a typical 1.4 tons per cubic yard. With a ten percent allowance, you would order about 7.6 tons. Enter your own dimensions and depth above for the exact figure, since both change the answer significantly.

How much gravel do I need for a 12 by 12 foot area?

At 4 inches deep, a 12 by 12 foot area is 144 square feet, which is about 1.78 cubic yards or roughly 2.5 tons of a typical crushed stone. With a ten percent allowance, order about 2.7 tons. At 2 inches deep, you need roughly half that amount. Enter your own depth above for the exact figure.

How do I calculate how much gravel I need by hand?

Multiply the area in square feet by the depth in feet to get cubic feet, divide by 27 for cubic yards, then multiply by the tons per cubic yard for your material. For 300 square feet at 3 inches deep: 300 times 0.25 is 75 cubic feet, divided by 27 is 2.78 cubic yards, or about 3.9 tons at a density of 1.4. The calculator does all three steps.

How much gravel do I need for a 100 foot long path?

It depends on the path width and depth. A 3 foot wide path at 2 inches deep needs about 1.85 cubic yards or roughly 2.6 tons. A 4 foot wide path at the same depth needs about 2.47 cubic yards or 3.5 tons. The calculator lets you enter the exact area, so the path width and depth both feed into the result.

How much gravel do I need for a 500 square foot area?

At 2 inches deep, 500 square feet needs about 3.1 cubic yards, roughly 4.3 tons. At 4 inches deep, that doubles to about 6.2 cubic yards and 8.6 tons. The difference between 2 and 4 inches is exactly double the material, which is why depth matters more than almost any other input. Enter your own depth above.

How do I know what depth to use?

Decorative beds and paths are commonly 2 to 3 inches deep. Driveways are usually built deeper, often 4 to 8 inches in total layers. Paver bases commonly run 4 to 6 inches. These are starting points rather than requirements: soil type, drainage, climate and the load involved all change what a specific job needs.